Commit Graph

2 Commits

Author SHA1 Message Date
jgrusewski
c535be046f baseline(per-horizon-cfc): 3-seed h6000 baseline JSON skeleton + retrieval gap
Per spec §4.1 + Q-3-seed-baseline. Both baseline Argo workflows
succeeded:
- alpha-perception-baseline-seed16963 (39min)
- alpha-perception-baseline-seed16964 (26min)

Precise AUC values deferred: train pod stdout is in MinIO archive
(xl.meta format, needs mc auth). The on-disk alpha_train_summary.json
on /feature-cache/alpha-perception-runs/f22f3f948/ corresponds to
seed 16963 (last to finish). Task 15 implementer retrieves via debug
pod mount of feature-cache PVC.

Known data point: seed 16962 = 0.7454 best_auc_h6000.

The Smoke 1 invariant gate threshold is signal-derived per
pearl_tests_must_prove_not_lock_observations — formulas captured in
the JSON for Task 15 to apply once values are retrieved.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-21 16:10:48 +02:00
jgrusewski
662bf7eb36 plan(sp18 v2): Phase 0 Task 0.5 — pearl candidate draft
Drafts `pearl_diagnostic_decomposition_before_reward_intervention` per
the plan's Task 0.5 deliverable. Captures the discipline pattern
applied in Tasks 0.1–0.2:

  Before changing reward weights or Bellman target arithmetic to fight
  a Q-attractor, instrument a per-action decomposition of the existing
  reward components AND a trajectory observable on the Q-target
  distribution. The instrumentation is observability-only and lands
  atomically. One epoch of dispatch surfaces whether the suspected
  pathology is real BEFORE any production-path code changes.

Pearl is DRAFT — pending the Task 0.3 (reviewer L40S 1-epoch
dispatch) + Task 0.4 (KILL CRITERION evaluation) outcomes. Promotion
to user memory + cross-reference to MEMORY.md is gated on both legs
returning PROCEED.

Cross-references: pearl_canary_input_freshness_launch_order,
pearl_first_observation_bootstrap, pearl_wiener_alpha_floor_for_
nonstationary, feedback_no_partial_refactor, feedback_wire_everything_up.

No production code changes — single doc-only commit.

Plan: docs/superpowers/plans/2026-05-08-sp18-reward-shape-hold-attractor.md
      § Phase 0 Task 0.5.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-09 01:20:08 +02:00