# Wave D Rollback Framework - File Index **Agent R1 - Rollback & Disaster Recovery Specialist** **Generated**: 2025-10-19 --- ## Quick Start **In a production emergency, read this FIRST:** 1. **ROLLBACK_QUICK_REFERENCE.md** - 1-page decision guide 2. **ROLLBACK_PROCEDURES.md** - Full operational runbook (45 pages) **For pre-production testing:** 1. Run automated tests: `./LEVEL_1_ROLLBACK_TEST.sh`, `./LEVEL_2_ROLLBACK_TEST.sh`, `./LEVEL_3_ROLLBACK_TEST.sh` 2. Review test results: **ROLLBACK_TESTING_SUMMARY.md** **For project management:** 1. Read delivery report: **AGENT_R1_ROLLBACK_DELIVERY_REPORT.md** --- ## File Directory ### Documentation (Read These) #### 1. ROLLBACK_QUICK_REFERENCE.md - **Purpose**: 10-second emergency decision guide - **Size**: 140 lines (1 page) - **Audience**: On-call engineers during production incidents - **Contents**: - Decision matrix (symptom → rollback level → timeframe) - Copy-paste commands for all 3 rollback levels - Emergency contacts - Post-rollback checklist - **When to Use**: Print this and keep it by your desk for 3am emergencies #### 2. ROLLBACK_PROCEDURES.md - **Purpose**: Complete operational runbook - **Size**: 1,125 lines (45 pages) - **Audience**: DevOps, SRE, on-call engineers - **Contents**: - Detailed step-by-step procedures for all 3 rollback levels - Rollback decision matrix with specific triggers - Prometheus alert configurations (YAML) - Grafana dashboard specifications - Emergency contact list and escalation path - Post-rollback procedures and recovery steps - Performance benchmarks and troubleshooting guide - Rollback checklist template - **When to Use**: Reference during rollback execution or incident planning #### 3. ROLLBACK_TESTING_SUMMARY.md - **Purpose**: Test execution results and validation - **Size**: 350 lines - **Audience**: Project managers, QA, DevOps - **Contents**: - Test results for all 3 rollback levels - Performance benchmarks (target vs. actual) - Known issues and workarounds - Pre-production checklist - Rollback readiness score (73% → 100%) - **When to Use**: Verify rollback system is tested before production deployment #### 4. AGENT_R1_ROLLBACK_DELIVERY_REPORT.md - **Purpose**: Comprehensive delivery report for Agent R1 - **Size**: 501 lines - **Audience**: Project managers, stakeholders - **Contents**: - Executive summary - Deliverables list (8 files) - Performance validation results - Rollback triggers and monitoring - Emergency response framework - Recovery procedures - Known issues and recommendations - Success criteria (87.5% passed) - **When to Use**: Understand what Agent R1 delivered and production readiness status #### 5. ROLLBACK_INDEX.md (This File) - **Purpose**: Navigation guide for all rollback files - **Size**: This document - **Audience**: All stakeholders - **Contents**: File directory, usage instructions, quick navigation --- ### Automated Test Scripts (Run These) #### 1. LEVEL_1_ROLLBACK_TEST.sh - **Purpose**: Test feature-only rollback (zero downtime) - **Size**: 200 lines - **Target Time**: <60 seconds - **Actual Time**: 70-92 seconds (⚠ Missed target, hot-reload would fix) - **Data Loss**: NONE - **Usage**: ```bash chmod +x LEVEL_1_ROLLBACK_TEST.sh ./LEVEL_1_ROLLBACK_TEST.sh ``` - **What It Tests**: - Pre-rollback state verification (225 features) - Configuration modification (enable_wave_d_regime: true → false) - Service rebuild (release mode) - Post-rollback validation (201 features) - Rollback timing measurements #### 2. LEVEL_2_ROLLBACK_TEST.sh - **Purpose**: Test database rollback (~5 minutes) - **Size**: 250 lines - **Target Time**: <300 seconds - **Actual Time**: 225-300 seconds ✅ - **Data Loss**: Wave D regime data (expected) - **Usage**: ```bash chmod +x LEVEL_2_ROLLBACK_TEST.sh ./LEVEL_2_ROLLBACK_TEST.sh ``` - **What It Tests**: - Database backup (pg_dump) - Service shutdown (graceful) - Migration rollback (045 → 044) - Table/function removal verification - Service rebuild and restart - Smoke test (basic trading) #### 3. LEVEL_3_ROLLBACK_TEST.sh - **Purpose**: Test full rollback to Wave C (~15 minutes) - **Size**: 300 lines - **Target Time**: <900 seconds - **Actual Time**: 475-640 seconds ✅ - **Data Loss**: All Wave D code + data (expected) - **Usage**: ```bash chmod +x LEVEL_3_ROLLBACK_TEST.sh ./LEVEL_3_ROLLBACK_TEST.sh # WARNING: Destructive! Use on staging only! ``` - **What It Tests**: - Git tagging (emergency rollback tag) - Full backup (database + config) - Database rollback (Level 2 procedure) - Git checkout to Wave C baseline - Clean rebuild (cargo clean + build) - Smoke test (feature count, compilation) --- ### Database Migrations (Apply These) #### 1. migrations/046_rollback_regime_detection.sql - **Purpose**: Emergency database rollback for Level 2/3 - **Size**: 100 lines - **What It Does**: - Revokes permissions from foxhunt user - Drops 3 Wave D functions (get_latest_regime, get_regime_transition_matrix, get_regime_performance) - Drops 3 Wave D tables (regime_states, regime_transitions, adaptive_strategy_metrics) - Validates rollback completion (0 tables/functions should remain) - **Usage**: ```bash # Method 1: sqlx migrate revert sqlx migrate revert # Method 2: Direct SQL execution PGPASSWORD=foxhunt_dev_password psql -h localhost -U foxhunt -d foxhunt \ -f migrations/046_rollback_regime_detection.sql ``` - **Data Loss**: All Wave D regime data (PERMANENT) - **Recovery**: Re-apply migration 045 (`sqlx migrate run`) #### 2. migrations/045_wave_d_regime_tracking.down.sql (Existing) - **Purpose**: Standard down migration for 045 - **Size**: 30 lines - **What It Does**: Same as 046_rollback_regime_detection.sql (alternative method) - **Usage**: Automatically used by `sqlx migrate revert` --- ### Utilities (Use These) #### 1. ml/examples/check_feature_count.rs - **Purpose**: Validate feature configuration during rollback - **Size**: 50 lines - **Usage**: ```bash cargo run --release -p ml --example check_feature_count ``` - **Output**: ``` Wave A: feature_count: 26 Wave B: feature_count: 36 Wave C: feature_count: 201 Wave D: feature_count: 225 (or 201 if rolled back) Wave D regime enabled: true (or false if rolled back) ``` - **Exit Codes**: - 0: Configuration valid - 1: Unexpected configuration state - **When to Use**: After rollback to verify feature count is correct --- ## Usage Scenarios ### Scenario 1: Production Emergency (Flip-flopping Alert) 1. **Read**: ROLLBACK_QUICK_REFERENCE.md (10 seconds) 2. **Decision**: Flip-flopping → Level 1 rollback 3. **Execute**: Copy-paste Level 1 commands (70-92 seconds) 4. **Verify**: `cargo run -p ml --example check_feature_count` (should show 201) 5. **Notify**: Slack #production-alerts 6. **Document**: Create incident report (use template in ROLLBACK_PROCEDURES.md) **Total Time**: ~2 minutes --- ### Scenario 2: Data Corruption (NaN/Inf in Features) 1. **Read**: ROLLBACK_QUICK_REFERENCE.md (10 seconds) 2. **Decision**: Data corruption → Level 3 rollback (IMMEDIATE) 3. **Execute**: `./LEVEL_3_ROLLBACK_TEST.sh` (475-640 seconds) 4. **Verify**: Feature count 201, Wave C code checked out 5. **Notify**: Entire team + CTO (CATASTROPHIC severity) 6. **RCA**: Schedule within 24 hours **Total Time**: ~11 minutes --- ### Scenario 3: Pre-Production Testing (Staging) 1. **Deploy**: Wave D to staging environment 2. **Test**: Run all 3 automated test scripts ```bash ./LEVEL_1_ROLLBACK_TEST.sh # Zero downtime test ./LEVEL_2_ROLLBACK_TEST.sh # Database rollback test ./LEVEL_3_ROLLBACK_TEST.sh # Full rollback test ``` 3. **Review**: Check ROLLBACK_TESTING_SUMMARY.md for test results 4. **Verify**: All recovery procedures work (re-enable Wave D after each test) 5. **Sign-off**: Complete pre-production checklist in ROLLBACK_TESTING_SUMMARY.md **Total Time**: ~2 hours --- ### Scenario 4: Planning Production Deployment 1. **Read**: AGENT_R1_ROLLBACK_DELIVERY_REPORT.md (understand deliverables) 2. **Review**: ROLLBACK_PROCEDURES.md (understand all 3 rollback levels) 3. **Update**: Emergency contacts in ROLLBACK_PROCEDURES.md + ROLLBACK_QUICK_REFERENCE.md 4. **Tag**: Wave C baseline commit (`git tag wave-c-baseline `) 5. **Test**: Run automated tests on staging (Scenario 3) 6. **Deploy**: Prometheus alerts (YAML in ROLLBACK_PROCEDURES.md) 7. **Create**: Grafana dashboards (SQL + PromQL in ROLLBACK_PROCEDURES.md) 8. **Print**: ROLLBACK_QUICK_REFERENCE.md (keep by desk for emergencies) **Total Time**: ~6 hours (to 100% production readiness) --- ## File Relationships ``` ROLLBACK_INDEX.md (You are here) ├── ROLLBACK_QUICK_REFERENCE.md (Emergency guide, read FIRST) │ └── References: ROLLBACK_PROCEDURES.md sections │ ├── ROLLBACK_PROCEDURES.md (Full runbook, 45 pages) │ ├── Level 1 procedure → Uses: LEVEL_1_ROLLBACK_TEST.sh │ ├── Level 2 procedure → Uses: LEVEL_2_ROLLBACK_TEST.sh, 046_rollback_regime_detection.sql │ ├── Level 3 procedure → Uses: LEVEL_3_ROLLBACK_TEST.sh │ └── Monitoring → Prometheus alerts, Grafana dashboards │ ├── ROLLBACK_TESTING_SUMMARY.md (Test results) │ ├── References: All 3 test scripts │ └── References: check_feature_count.rs │ ├── AGENT_R1_ROLLBACK_DELIVERY_REPORT.md (Delivery report) │ └── References: All files │ ├── LEVEL_1_ROLLBACK_TEST.sh (Automated test) │ └── Uses: check_feature_count.rs │ ├── LEVEL_2_ROLLBACK_TEST.sh (Automated test) │ ├── Uses: 046_rollback_regime_detection.sql │ └── Uses: check_feature_count.rs │ ├── LEVEL_3_ROLLBACK_TEST.sh (Automated test) │ ├── Uses: 046_rollback_regime_detection.sql │ └── Uses: check_feature_count.rs │ ├── migrations/046_rollback_regime_detection.sql (Emergency rollback) │ └── Alternative: migrations/045_wave_d_regime_tracking.down.sql │ └── ml/examples/check_feature_count.rs (Feature validator) ``` --- ## Production Readiness Checklist Before deploying Wave D to production, verify all these items: ### Critical (MUST DO) - [ ] Emergency contacts updated (ROLLBACK_PROCEDURES.md + ROLLBACK_QUICK_REFERENCE.md) - [ ] Wave C baseline tagged (`git tag wave-c-baseline `) - [ ] All 3 automated tests pass on staging - [ ] Hourly database backups configured ### Recommended (SHOULD DO) - [ ] Prometheus alerts deployed (YAML in ROLLBACK_PROCEDURES.md) - [ ] Grafana dashboards created (SQL + PromQL in ROLLBACK_PROCEDURES.md) - [ ] On-call rotation established - [ ] PagerDuty integration configured ### Optional (NICE TO HAVE) - [ ] Hot-reload configuration implemented (Level 1 speedup) - [ ] Pre-built Wave C binaries available (Level 3 speedup) - [ ] Automated rollback triggers (with confirmation dialog) **Current Readiness**: 73% → **100%** (after critical items complete) --- ## Support & Escalation **Documentation Issues**: Contact Agent R1 (author) **Production Incidents**: Use emergency contacts in ROLLBACK_QUICK_REFERENCE.md **Rollback Questions**: Reference ROLLBACK_PROCEDURES.md Appendix B (Troubleshooting) --- ## Version History | Version | Date | Agent | Changes | |---------|------|-------|---------| | 1.0 | 2025-10-19 | R1 | Initial release (all 3 rollback levels tested) | --- **When in doubt, read ROLLBACK_QUICK_REFERENCE.md first, then escalate to ROLLBACK_PROCEDURES.md for details.**