# DQN Backtesting Report **Model**: DQN-Marginal-Example **Baseline**: DQN-Trial35-Baseline **Generated**: 2025-11-04 07:56:33 UTC --- ## Performance Summary | Metric | Value | Target | Status | |--------|-------|--------|--------| | Total Return | 5.30% | >0% | ✅ | | Sharpe Ratio | 1.20 | >1.5 | ❌ | | Max Drawdown | 22.80% | <20% | ❌ | | Win Rate | 48.0% | >50% | ❌ | | Alpha vs B&H | 0.80% | >0% | ✅ | ## Comparison to Baseline | Metric | Baseline | New Model | Change | Direction | |--------|----------|-----------|--------|----------| | Returns | 12.10% | 5.30% | -6.80% | ↘️ | | Sharpe | 1.80 | 1.20 | -0.60 | ↘️ | | Drawdown | 18.30% | 22.80% | +4.50% | ↘️ | | Win Rate | 52.0% | 48.0% | -4.0% | ↘️ | | Alpha | 1.50% | 0.80% | -0.70% | ↘️ | ## Trade Statistics | Metric | Value | |--------|-------| | Total Trades | 125 | | Avg Trade Return | 0.042% | | Win Rate | 48.00% | | Trades vs Baseline | -13 | ## Deployment Recommendation **Status**: ⚠️ REVIEW - Marginal Performance Model passes 2/5 production criteria. Performance is marginal and requires careful review. **Concerns**: - ❌ Low Sharpe ratio (1.20 < 1.5) - ❌ Excessive drawdown (22.80% > 20%) - ❌ Poor win rate (48.0% < 50%) **Action**: Conduct detailed risk assessment and consider additional testing before deployment. ### Production Criteria Checklist - **Criteria Passed**: 2/5 - **Total Return**: ✅ PASS (5.30% > 0%) - **Sharpe Ratio**: ❌ FAIL (1.20 > 1.5) - **Max Drawdown**: ❌ FAIL (22.80% < 20%) - **Win Rate**: ❌ FAIL (48.0% > 50%) - **Alpha vs B&H**: ✅ PASS (0.80% > 0%) --- *Report generated automatically by Foxhunt ML Evaluation Framework*