Files
foxhunt/docs/templates/deployment-checklist.md
jgrusewski 7458f1be01 feat(wave12): E2E validation complete - 225-feature pipeline ready
 Validation Results:
- PPO training: 24.2s (1 epoch, 950 samples, dim=225)
- Feature extraction: 105μs/bar (9.5x faster than target)
- Model checkpoint: 293KB (147KB actor + 146KB critic)
- GPU memory: 145MB used (96.4% headroom)
- Zero dimension mismatches

📊 Success Criteria (5/5):
 Feature dimension = 225 (Wave C 201 + Wave D 24)
 Model state_dim = 225
 Training completed without errors
 Checkpoint saved successfully
 No dimension mismatch errors

📁 Training Data Ready:
- ES.FUT: 2.9MB, 180 days
- NQ.FUT: 4.4MB, 180 days
- 6E.FUT: 2.8MB, 180 days
- ZN.FUT: 65KB, 90 days (clean)

🚀 Next: Full production model retraining (4 models, ~10min GPU time)

🤖 Generated with Claude Code (https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-10-22 22:48:04 +02:00

1.6 KiB

Deployment Checklist

Date: YYYY-MM-DD Version: vX.X.X Deployer: [Your Name] Environment: [Production/Staging/Development]


Pre-Deployment (T-24 hours)

  • All tests pass in CI/CD pipeline
  • Code review completed and approved
  • Security scan passed (no critical vulnerabilities)
  • Database migration tested in staging
  • Rollback plan documented
  • Deployment window scheduled
  • On-call engineer notified
  • Stakeholders notified

Pre-Deployment (T-1 hour)

  • Backup created: /backup/foxhunt_backup_YYYYMMDD_HHMMSS.dump
  • Backup verified (can be restored)
  • Monitoring dashboards open
  • Alert thresholds reviewed
  • Deployment script tested in staging
  • Communication channel ready (#deployment-YYYY-MM-DD)

During Deployment

  • Maintenance mode enabled (if applicable)
  • Database migration applied successfully
  • Application deployed (version: ________)
  • Health checks passing
  • Smoke tests executed successfully
  • Metrics baseline established

Post-Deployment (T+30 min)

  • All services healthy
  • Error rate < 1%
  • Latency P99 < 500ms
  • Database connections < 80%
  • Memory usage stable
  • No critical alerts fired
  • End-to-end test passed

Post-Deployment (T+24 hours)

  • No rollbacks required
  • Performance metrics within targets
  • No customer complaints
  • Deployment marked as successful
  • Documentation updated

Notes

[Any issues encountered during deployment]


Sign-Off

Deployed by: _______________ Verified by: _______________ Date/Time: _______________