8-task TDD plan to bridge 8 disconnected layers in the backtesting pipeline: DBN converter, replay engine, 51-dim feature wiring, model loader, registry startup, position tracking, PnL tracking, and end-to-end integration test. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>