PP.5 is the B-DD6 headroom-check: profile current
gpu_experience_collector::collect_experience end-to-end ms/cycle on
H100 to confirm budget for the new target-net forward pass (B-leg
Phase 4 estimated ~30% slowdown). Plan explicitly marks this as
reviewer-only ("subagent CANNOT run this step (reviewer-only). Hands
off to reviewer at PP.5.").
Pre-Phase subagent dispatch context lacks H100/Argo deploy access, so
the actual nsys profile is deferred to Phase 4 reviewer pickup. NO
production code modified — this is observability infrastructure for
the Phase 4 atomic refactor's regression check.
Pre-Phase exit criteria still satisfied (22 ISV slots locked, registry
entries with dispatch arms, retirement markers, audit doc current);
only the H100 measurement is deferred per the plan's reviewer-only
gating.
Phase 4 pickup instructions documented in audit doc (4-step procedure:
push → argo-train profile → read nsys → fallback rules + human-review
gate).
Plan: docs/superpowers/plans/2026-05-08-sp18-reward-shape-hold-attractor.md
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>