Files
foxhunt/crates
jgrusewski 7d0a29dced feat(sp15-p2a.1): LobBar canonical ABI + 4 synthetic market generators
Phase 2A scaffolding lands FIRST per spec §4.4 ABI contract. Phase 1.2
cost kernel reads LobBar; both dev synthetic and prod fxcache produce
LobBar — dev/prod parity per Q3.

Generators: flat_market, drift_market, ou_market, regime_switch_market
(seeded RNG for reproducible tests). Regime-switch test uses sticky
0.99/0.01 transitions (true regime persistence; spec's 50/50 was a
random walk, not a regime switch — corrected with code comment).

behavioral_suite test target wired into Cargo.toml; will run all
22 Phase 2 tests once they land in Phase 2B/2C.

Audit doc: SP15 Phase 2A.1 entry appended to docs/dqn-wire-up-audit.md
per Invariant 7 (component changes require audit-doc update).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-06 10:57:51 +02:00
..