- Created data/examples/download_ml_training_data.rs using reqwest + Databento HTTP API - Downloaded 90 days × 4 symbols (ES.FUT, NQ.FUT, ZN.FUT, 6E.FUT) - Files saved to test_data/real/databento/ml_training/ - Total: 360 files, 15 MB compressed DBN format - Used existing Rust pattern from download_nq_fut.rs - API key loaded from .env file - 100% success rate (360/360 files) - Ready for ML training benchmarks Next: Create simplified training benchmark for RTX 3050 Ti GPU measurements
14 KiB
Real Data Integration - Next Steps Roadmap
Date: 2025-10-13 Status: Real Data Integration Complete ✅ Phase: Trading Strategy Development
🎯 Executive Summary
With real data integration complete, the focus shifts to expanding data coverage and validating strategies with production-grade market data.
Current Status:
- ✅ DBN integration operational (0.70ms, 14x faster than target)
- ✅ 6 DBN files acquired (ES.FUT, ESH4, NQ.FUT, CL.FUT)
- ✅ 19/19 tests passing (100%)
- ✅ 29,000+ lines of documentation
Immediate Priority: Expand data coverage to 5-10 symbols, 30-90 days
📋 Phase 1: Data Coverage Expansion (1-2 Weeks)
Priority 1: Additional Futures Symbols (HIGH)
Target: 5-10 futures symbols across multiple asset classes
Symbols to Acquire:
-
ES.FUT - E-mini S&P 500 (already have 1 day ✅)
- Expand to 30-90 days
- Target: Q4 2024 (bull market) + Q1 2025 (volatile)
-
NQ.FUT - E-mini Nasdaq 100 (already have 1 day ✅)
- Expand to 30-90 days
- High correlation with tech sector
-
CL.FUT - Crude Oil (already have 1 day ✅)
- Expand to 30-90 days
- Energy sector, geopolitical volatility
-
GC.FUT - Gold Futures (NEW)
- 30-90 days
- Safe haven asset, inflation hedge
-
ZN.FUT - 10-Year Treasury Note (NEW)
- 30-90 days
- Interest rate sensitivity, bond market
-
6E.FUT - Euro FX (NEW, Optional)
- 30-90 days
- Currency markets, forex volatility
Data Requirements:
- Format: DBN (Databento Binary) 1-minute OHLCV
- Venue: CME Group (ES, NQ, CL, GC, ZN) + ICE (6E)
- Dataset:
ohlcv-1mschema - Date Range: 30-90 consecutive days (Jan-Mar 2024 or Oct-Dec 2024)
Effort: 2-3 days
- Day 1: Databento API setup, credit purchase (~$50-100)
- Day 2: Download scripts, file organization, validation
- Day 3: Test integration, documentation updates
Success Criteria:
- ✅ 5-10 symbols with 30+ days each
- ✅ All files validated with automatic anomaly correction
- ✅ Test coverage updated to use new symbols
- ✅ Documentation updated with new data inventory
Priority 2: Multi-Day Integration Tests (MEDIUM)
Goal: Validate multi-day loading and continuity
Tasks:
- Create 30-day continuous backtest test
- Validate timestamp ordering across days
- Test overnight gaps and weekends
- Validate data quality across entire range
Files to Update:
services/backtesting_service/tests/dbn_multi_day_tests.rsservices/integration_tests/tests/backtest_real_data_test.rs(NEW)
Effort: 1-2 days
Success Criteria:
- ✅ 30-day continuous backtest passing
- ✅ Gap handling validated (weekends, holidays)
- ✅ Cross-day metrics correct (PnL, drawdown)
Priority 3: Automated Data Pipeline (MEDIUM)
Goal: Automate data acquisition and validation
Components:
-
Download Script (
scripts/download_dbn_data.sh)- Databento API integration
- Bulk download support
- Progress tracking
-
Validation Script (
scripts/validate_dbn_quality.sh)- Automatic anomaly detection
- OHLCV validation
- Summary statistics
-
Update Script (
scripts/update_test_data.sh)- Weekly/monthly data refresh
- Version control (git LFS for large files)
Effort: 2-3 days
Success Criteria:
- ✅ One-command data acquisition
- ✅ Automatic validation on download
- ✅ CI/CD integration (weekly data updates)
📋 Phase 2: Strategy Backtesting (1-2 Weeks)
Priority 1: Backtest Existing Strategies (HIGH)
Strategies to Test:
-
Moving Average Crossover (
trading_engine/src/strategies/moving_average_crossover.rs)- Test with ES.FUT 30-day dataset
- Validate signals vs synthetic data
- Measure Sharpe, drawdown, win rate
-
Adaptive Strategy (
trading_engine/src/strategies/adaptive_strategy.rs)- Test regime detection with real volatility
- Validate trending/ranging/sideways classification
- Compare vs synthetic regime transitions
-
Mean Reversion (if implemented)
- Test with ranging market data
- Validate entry/exit timing
-
Momentum (if implemented)
- Test with trending market data
- Validate breakout detection
Effort: 3-5 days (1-2 days per strategy)
Success Criteria:
- ✅ All strategies tested with 30+ days of real data
- ✅ Performance metrics documented (Sharpe, drawdown, PnL, win rate)
- ✅ Edge cases identified (gaps, outliers, extreme volatility)
- ✅ Comparison report: synthetic vs real data performance
Priority 2: Multi-Symbol Portfolio Backtest (MEDIUM)
Goal: Test portfolio-level strategies with real cross-asset data
Scenarios:
- Sector Rotation: ES.FUT (equities) vs ZN.FUT (bonds)
- Risk Parity: ES, NQ, CL, GC diversification
- Hedge Strategies: Long ES, short NQ during tech sell-off
Effort: 2-3 days
Success Criteria:
- ✅ Multi-symbol backtest infrastructure operational
- ✅ Portfolio-level metrics (total PnL, correlation, beta)
- ✅ Rebalancing logic validated
Priority 3: Transaction Cost & Slippage (MEDIUM)
Goal: Model realistic execution costs
Implementation:
- Add bid-ask spread simulation
- Model slippage based on volume
- Include commission structure (CME fees)
- Validate impact on strategy profitability
Effort: 2-3 days
Success Criteria:
- ✅ Realistic cost model implemented
- ✅ All strategies re-tested with costs
- ✅ Profitability adjusted for slippage
📋 Phase 3: ML Model Validation (1-2 Weeks)
Priority 1: MAMBA-2 Model (HIGH)
Goal: Test state space model with real market data
Tasks:
- Load ES.FUT 30-day dataset
- Generate features (price, volume, volatility)
- Run inference on all bars
- Measure prediction accuracy vs real outcomes
- Compare vs synthetic data performance
Effort: 2-3 days
Success Criteria:
- ✅ MAMBA-2 inference operational with real data
- ✅ Prediction accuracy measured (MAE, RMSE, R²)
- ✅ Overfitting identified (if any)
- ✅ Hyperparameter adjustments documented
Priority 2: DQN/PPO Reinforcement Learning (HIGH)
Goal: Test RL agents with real market environments
Tasks:
- Create environment using real data replay
- Train DQN/PPO agents on 30-day datasets
- Validate action selection vs real outcomes
- Measure reward accumulation
- Compare vs synthetic environment performance
Effort: 3-4 days
Success Criteria:
- ✅ DQN/PPO training operational with real data
- ✅ Cumulative reward measured
- ✅ Policy convergence validated
- ✅ Overfitting identified (if any)
Priority 3: TFT Forecasting (MEDIUM)
Goal: Test temporal fusion transformer for price prediction
Tasks:
- Load multi-day dataset for time series
- Generate temporal features
- Train TFT on historical data
- Validate forecasting accuracy
- Measure inference latency
Effort: 2-3 days
Success Criteria:
- ✅ TFT training operational with real data
- ✅ Forecast accuracy measured (MAPE, MAE)
- ✅ Multi-step ahead forecasting validated
Priority 4: Feature Engineering Validation (MEDIUM)
Goal: Validate feature extraction with real market data
Tasks:
- Test technical indicators (SMA, EMA, RSI, MACD)
- Validate microstructure features (bid-ask, order imbalance)
- Test TLOB (Temporal Limit Order Book) features
- Measure feature importance with real data
Effort: 1-2 days
Success Criteria:
- ✅ All feature extractors operational
- ✅ Feature distributions analyzed (vs synthetic)
- ✅ Feature importance ranking documented
📋 Phase 4: Replace Mock Data in Tests (1 Week)
Priority 1: E2E Test Conversion (HIGH)
Goal: Replace synthetic data with real DBN data in all E2E tests
Files to Update:
services/integration_tests/tests/backtest_integration_test.rsservices/integration_tests/tests/ml_pipeline_test.rsservices/integration_tests/tests/trading_service_test.rs
Effort: 2-3 days
Success Criteria:
- ✅ All E2E tests use real DBN data
- ✅ 22/22 tests still passing (100%)
- ✅ Test execution time acceptable (<5 min)
Priority 2: Unit Test Conversion (MEDIUM)
Goal: Replace mock data generators with real data helpers
Files to Update:
trading_engine/tests/strategy_tests.rsml/tests/model_tests.rsdata/tests/feature_extraction_tests.rs
Effort: 2-3 days
Success Criteria:
- ✅ Unit tests use real data samples
- ✅ Test coverage maintained (>95%)
- ✅ Edge cases validated with real anomalies
📋 Phase 5: Performance Optimization (Optional, 1 Week)
Priority 1: Metadata Caching (MEDIUM)
Goal: Cache file metadata for faster date range queries
Implementation:
- Add
first_tsandlast_tstoFileEntry - Parse first/last record on initial load
- Skip files outside date range
Effort: 1-2 days
Success Criteria:
- ✅ 3x speedup for single-day queries on multi-day datasets
- ✅ Backward compatibility maintained
Priority 2: Parallel File Loading (LOW)
Goal: Load multiple files concurrently
Implementation:
- Use
tokio::task::JoinSet - Load files in parallel
- Merge results after completion
Effort: 1-2 days
Success Criteria:
- ✅ Near-linear speedup (3 files in ~1ms instead of 2.1ms)
- ✅ Thread-safe decoder handling
Priority 3: LRU Cache Implementation (LOW)
Goal: Avoid reloading same files for repeated queries
Implementation:
- Replace
HashMapwithlru::LruCache - Configurable cache size
- Eviction policy
Effort: 1 day
Success Criteria:
- ✅ Near-instant repeated queries (cache hit = 0.001ms)
- ✅ Memory bounded (configurable limit)
📅 Timeline Summary
| Phase | Duration | Priority | Status |
|---|---|---|---|
| Phase 1: Data Expansion | 1-2 weeks | HIGH | 🔜 Next |
| Phase 2: Strategy Backtesting | 1-2 weeks | HIGH | ⏸️ Pending data |
| Phase 3: ML Validation | 1-2 weeks | HIGH | ⏸️ Pending data |
| Phase 4: Mock Data Replacement | 1 week | MEDIUM | ⏸️ Pending validation |
| Phase 5: Performance Optimization | 1 week | LOW | ⏸️ Optional |
Total Duration: 4-7 weeks (depending on parallel execution)
🎯 Success Metrics
Data Coverage
- Target: 5-10 symbols, 30-90 days each
- Current: 4 symbols, 1-4 days each
- Gap: 1-6 additional symbols, 26-89 additional days per symbol
Strategy Performance
- Target: All strategies validated with real data
- Current: Zero strategies tested with real data
- Gap: 3-5 strategies need validation
ML Model Accuracy
- Target: Accuracy measured on real data, overfitting identified
- Current: No ML models tested with real data
- Gap: 4 models (MAMBA-2, DQN, PPO, TFT) need validation
Test Coverage
- Target: 100% real data in tests
- Current: 19/19 backtesting tests use real data, 0/22 E2E tests
- Gap: 22 E2E tests need conversion
📝 Deliverables by Phase
Phase 1 Deliverables
- 5-10 DBN files (30-90 days each)
- Updated data inventory documentation
- Automated download/validation scripts
- Multi-day integration tests (30+ days)
Phase 2 Deliverables
- Strategy backtest reports (Sharpe, drawdown, PnL)
- Synthetic vs real data comparison
- Multi-symbol portfolio backtest results
- Transaction cost model implementation
Phase 3 Deliverables
- MAMBA-2 accuracy report (real data)
- DQN/PPO training results (real data)
- TFT forecasting accuracy report
- Feature importance analysis (real vs synthetic)
Phase 4 Deliverables
- E2E tests converted to real data
- Unit tests converted to real data
- 22/22 E2E tests passing (100%)
- Test execution time optimized
Phase 5 Deliverables (Optional)
- Metadata caching implemented
- Parallel file loading implemented
- LRU cache implemented
- Performance benchmark report
🚀 Getting Started
Immediate Next Step: Expand Data Coverage
Action: Acquire 5-10 symbols with 30-90 days each
Execution Plan:
# Step 1: Set up Databento API credentials
export DATABENTO_API_KEY="your_api_key_here"
# Step 2: Run download script (to be created)
./scripts/download_dbn_data.sh --symbols ES.FUT,NQ.FUT,CL.FUT,GC.FUT,ZN.FUT --start 2024-01-01 --end 2024-03-31
# Step 3: Validate data quality
./scripts/validate_dbn_quality.sh test_data/real/databento/*.dbn
# Step 4: Run tests
cargo test -p backtesting_service --test dbn_multi_day_tests
cargo test -p backtesting_service --test dbn_integration_tests
# Step 5: Update documentation
# - Update CLAUDE.md with new data inventory
# - Update DBN_INTEGRATION_GUIDE.md with new examples
Expected Outcome:
- ✅ 5-10 symbols with 30-90 days each acquired
- ✅ All files validated with automatic anomaly correction
- ✅ Tests passing with expanded data coverage
- ✅ Documentation updated
Timeline: 2-3 days
📞 Questions & Support
For Data Acquisition:
- See
docs/DATABENTO_GUIDELINES.md - See
docs/DBN_INTEGRATION_GUIDE.md - Contact: Databento support (support@databento.com)
For Strategy Backtesting:
- See
docs/DBN_INTEGRATION_GUIDE.md(Integration Examples) - See
services/backtesting_service/DBN_REPOSITORY_USAGE.md - Review
docs/examples/dbn_backtesting_integration.rs
For ML Model Validation:
- See
TESTING_PLAN.md - See
ml/README.md(if exists) - Review
docs/examples/dbn_basic_loading.rs
For Performance Optimization:
- See
services/backtesting_service/tests/fixtures/PERFORMANCE.md - See
docs/DBN_TROUBLESHOOTING.md
Roadmap Created: 2025-10-13 Status: Real Data Integration Complete ✅ Next Milestone: Data Coverage Expansion (5-10 symbols, 30-90 days) Expected Completion: 1-2 weeks