Counterpart to existing val_active_frac. Reports the fraction of TRAINING rollout actions that were Long or Short. Required for L3 verification gate of Plan D (Phase 3) which checks Thompson is generating directional exploration during training. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>