Files
foxhunt/docs/templates/deployment-checklist.md
jgrusewski 7458f1be01 feat(wave12): E2E validation complete - 225-feature pipeline ready
 Validation Results:
- PPO training: 24.2s (1 epoch, 950 samples, dim=225)
- Feature extraction: 105μs/bar (9.5x faster than target)
- Model checkpoint: 293KB (147KB actor + 146KB critic)
- GPU memory: 145MB used (96.4% headroom)
- Zero dimension mismatches

📊 Success Criteria (5/5):
 Feature dimension = 225 (Wave C 201 + Wave D 24)
 Model state_dim = 225
 Training completed without errors
 Checkpoint saved successfully
 No dimension mismatch errors

📁 Training Data Ready:
- ES.FUT: 2.9MB, 180 days
- NQ.FUT: 4.4MB, 180 days
- 6E.FUT: 2.8MB, 180 days
- ZN.FUT: 65KB, 90 days (clean)

🚀 Next: Full production model retraining (4 models, ~10min GPU time)

🤖 Generated with Claude Code (https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-10-22 22:48:04 +02:00

70 lines
1.6 KiB
Markdown

# Deployment Checklist
**Date**: YYYY-MM-DD
**Version**: vX.X.X
**Deployer**: [Your Name]
**Environment**: [Production/Staging/Development]
---
## Pre-Deployment (T-24 hours)
- [ ] All tests pass in CI/CD pipeline
- [ ] Code review completed and approved
- [ ] Security scan passed (no critical vulnerabilities)
- [ ] Database migration tested in staging
- [ ] Rollback plan documented
- [ ] Deployment window scheduled
- [ ] On-call engineer notified
- [ ] Stakeholders notified
## Pre-Deployment (T-1 hour)
- [ ] Backup created: `/backup/foxhunt_backup_YYYYMMDD_HHMMSS.dump`
- [ ] Backup verified (can be restored)
- [ ] Monitoring dashboards open
- [ ] Alert thresholds reviewed
- [ ] Deployment script tested in staging
- [ ] Communication channel ready (#deployment-YYYY-MM-DD)
## During Deployment
- [ ] Maintenance mode enabled (if applicable)
- [ ] Database migration applied successfully
- [ ] Application deployed (version: ________)
- [ ] Health checks passing
- [ ] Smoke tests executed successfully
- [ ] Metrics baseline established
## Post-Deployment (T+30 min)
- [ ] All services healthy
- [ ] Error rate < 1%
- [ ] Latency P99 < 500ms
- [ ] Database connections < 80%
- [ ] Memory usage stable
- [ ] No critical alerts fired
- [ ] End-to-end test passed
## Post-Deployment (T+24 hours)
- [ ] No rollbacks required
- [ ] Performance metrics within targets
- [ ] No customer complaints
- [ ] Deployment marked as successful
- [ ] Documentation updated
---
## Notes
[Any issues encountered during deployment]
---
## Sign-Off
**Deployed by**: _______________
**Verified by**: _______________
**Date/Time**: _______________