✅ Validation Results: - PPO training: 24.2s (1 epoch, 950 samples, dim=225) - Feature extraction: 105μs/bar (9.5x faster than target) - Model checkpoint: 293KB (147KB actor + 146KB critic) - GPU memory: 145MB used (96.4% headroom) - Zero dimension mismatches 📊 Success Criteria (5/5): ✅ Feature dimension = 225 (Wave C 201 + Wave D 24) ✅ Model state_dim = 225 ✅ Training completed without errors ✅ Checkpoint saved successfully ✅ No dimension mismatch errors 📁 Training Data Ready: - ES.FUT: 2.9MB, 180 days - NQ.FUT: 4.4MB, 180 days - 6E.FUT: 2.8MB, 180 days - ZN.FUT: 65KB, 90 days (clean) 🚀 Next: Full production model retraining (4 models, ~10min GPU time) 🤖 Generated with Claude Code (https://claude.com/claude-code) Co-Authored-By: Claude <noreply@anthropic.com>
87 lines
2.9 KiB
Markdown
87 lines
2.9 KiB
Markdown
# Wave 4 Testing Roadmap
|
|
|
|
**Version**: 1.0
|
|
**Date**: 2025-10-22
|
|
**Author**: Agent W4-5
|
|
|
|
---
|
|
|
|
## Testing Evolution Roadmap
|
|
|
|
### ✅ Wave 4 Phase 1: Unit Tests (Agent W4-1) - COMPLETE
|
|
- **Status**: ✅ Complete
|
|
- **Deliverables**: 248 ML Training Service unit tests, 412 TLI unit tests
|
|
- **Coverage**: Unit test foundation established
|
|
|
|
### ✅ Wave 4 Phase 2: Integration Tests (Agent W4-2) - COMPLETE
|
|
- **Status**: ✅ Complete
|
|
- **Deliverables**: gRPC integration tests, database integration tests, job spawner tests
|
|
- **Coverage**: Service boundary validation
|
|
|
|
### ✅ Wave 4 Phase 3: E2E TLI Tests (Agent W4-3) - COMPLETE
|
|
- **Status**: ✅ Complete
|
|
- **Deliverables**: 147 TLI E2E tests, full workflow validation
|
|
- **Coverage**: User-facing workflows
|
|
|
|
### ✅ Wave 4 Phase 4: Stress Tests (Agent W4-4) - COMPLETE
|
|
- **Status**: ✅ Complete
|
|
- **Deliverables**: Concurrent order stress tests, memory leak detection, chaos tests
|
|
- **Coverage**: System resilience
|
|
|
|
### ✅ Wave 4 Phase 5: Test Documentation (Agent W4-5) - COMPLETE
|
|
- **Status**: ✅ Complete (this document)
|
|
- **Deliverables**: 7 comprehensive testing guides (12,847 LOC)
|
|
- **Coverage**: Complete testing knowledge base
|
|
|
|
---
|
|
|
|
## Future Testing Roadmap
|
|
|
|
### ⏳ Wave 5 Phase 1: Production Monitoring Tests (2 weeks)
|
|
- **Goal**: Validate monitoring and alerting systems
|
|
- **Tests**: Metrics collection, Grafana dashboards, Prometheus alerts
|
|
- **Coverage Target**: >80% for observability code
|
|
|
|
### ⏳ Wave 5 Phase 2: Chaos Engineering Tests (3 weeks)
|
|
- **Goal**: Validate system resilience to failures
|
|
- **Tests**: Network partitions, service crashes, database failures
|
|
- **Tools**: Chaos Mesh, Toxiproxy
|
|
- **Coverage Target**: >60% fault scenarios
|
|
|
|
### ⏳ Wave 5 Phase 3: Security Penetration Tests (2 weeks)
|
|
- **Goal**: Validate security posture
|
|
- **Tests**: SQL injection, XSS, CSRF, JWT tampering
|
|
- **Tools**: OWASP ZAP, Burp Suite
|
|
- **Coverage Target**: >90% for auth/authz code
|
|
|
|
### ⏳ Wave 6 Phase 1: Property-Based Testing (3 weeks)
|
|
- **Goal**: Exhaustive algorithm validation
|
|
- **Tests**: Order matching, risk calculations, ML feature extraction
|
|
- **Tool**: `proptest`
|
|
- **Coverage Target**: +5-8% overall coverage
|
|
|
|
### ⏳ Wave 6 Phase 2: Mutation Testing (2 weeks)
|
|
- **Goal**: Validate test quality (not coverage)
|
|
- **Tool**: `cargo-mutants`
|
|
- **Target**: >80% mutation kill rate
|
|
|
|
### ⏳ Wave 7: Production Readiness (4 weeks)
|
|
- **Goal**: 90% coverage for critical paths
|
|
- **Tests**: Exhaustive edge cases, full branch coverage
|
|
- **Coverage Target**: >90% workspace coverage
|
|
|
|
---
|
|
|
|
## Coverage Improvement Roadmap
|
|
|
|
| Wave | Target | Strategy | Effort |
|
|
|---|---|---|---|
|
|
| Wave 4 | 47.3% | Documentation + analysis | ✅ Complete |
|
|
| Wave 5 | 60% | +100 edge case tests, +50 integration | 2 weeks |
|
|
| Wave 6 | 75% | Chaos + property-based tests | 3 weeks |
|
|
| Wave 7 | 90% | Mutation testing + exhaustive coverage | 4 weeks |
|
|
|
|
---
|
|
|
|
**Last Updated**: 2025-10-22
|